Alternergy unit seeks approval for P1.85&B connection facility

THE SUBSIDIARY of Alternergy Holdings Corp. is seeking the approval of the Energy Regulatory Commission (ERC) to develop and operate a transmission facility to connect its wind power project in Quezon province to the Luzon grid. Alabat Wind Power Corp. (AWPC) aims to construct dedicated point-to-point limited transmission facilities with a total estimated cost of […]

Alternergy unit seeks approval for P1.85&B connection facility
THE SUBSIDIARY of Alternergy Holdings Corp. is seeking the approval of the Energy Regulatory Commission (ERC) to develop and operate a transmission facility to connect its wind power project in Quezon province to the Luzon grid. Alabat Wind Power Corp. (AWPC) aims to construct dedicated point-to-point limited transmission facilities with a total estimated cost of […]